Monday 18 January, Wednesday 20 January and Thursday 21 January
Southbound Tunnel.10pm to 6am
Routine maintenance is being carried out in the southbound tunnel. Southbound traffic will be diverted through the northbound tunnel in contraflow under a 40mph speed limit. Please allow an extra 5 minutes for your journey.
Tuesday 19 January
Full Tunnel Closure10pm to 6am
The tunnel will be fully closed to allow a routine structural inspection of the Miss James Bridge. At these times, signed diversion routes will be in place via the A325 and A31 for both north and southbound traffic. Please allow an extra 45 minutes for your journey.
Safe driving
Please stay in lane and observe the signed speed limit when using the Tunnel. If you see the Red X sign, please move safely to the other lane, as this means there is an obstruction ahead.
Further information
Please contact us on:
0300 123 5000
info@highwaysengland.co.uk.
No comments:
Post a Comment